ende
Compact and powerful: E Bus pantograph

Leading solutions for charging electric buses

With smart e-buses, public transport is taking a big step towards autonomy and sustainability. Our e-bus pantographs are the key to reliability, efficiency and compatibility. The pantographs function completely without manual intervention during operation and guarantee maximum operational safety. Our intelligent e-bus pantographs enable precise and reliable charging of battery-powered vehicles, which minimises downtimes and increases efficiency. The Schunk Group's innovative technology is perfectly tailored to the requirements of modern cities and transport companies. Our e-bus pantographs are compatible with various charging infrastructures and bus models.

  Electric buses with Schunk Smart Charging roof-mounted pantographs charge in the depot
From fast charging to remote diagnostics

ADVANTAGES OF E-BUS PANTOGRAPHS

Our e-bus pantographs are ideal for use in urban areas and depot charging systems. They not only offer innovative technologies, but also set new standards in charging automation.

Advantages

 

  • Automated operation thanks to autonomous charging processes
  • Fast charging, ideal for short stops
  • Sequential charging overnight
  • Flexible use for roof loading or inverted loading
  • Maximum compatibility with vehicles of different brands
  • Long operating times for your e-bus fleet

FAQ - frequently asked questions about e-bus pantographs

What are the advantages of an e-bus pantograph?

How long does it take to charge with an e-bus pantograph?

Are e-bus pantographs compatible with different bus brands?

Automated, fast and highly compatible

OUR RANGE OF E-BUS PANTOGRAPHS

The Schunk Group offers a comprehensive range of e-bus pantographs, including the SLS 102 and SLS 103 roof-mounted pantographs for stops with limited space and the SLS 202 inverted pantograph for urban charging infrastructures. We also offer an attractive solution for complex depot environments with the SLS 201 inverted pantograph.

Case Study: Schunk Smart Charging
Case Study: Schunk Smart Charging

100 Cities – 25 Countries: Schunk Smart Charging for Electric Buses is in Use Worldwide

Add
Brochure: Battery Driven Vehicles
Brochure: Battery Driven Vehicles

Pioneering charging solutions for the mobile future

Add
Brochure: Charging up in Seconds
Brochure: Charging up in Seconds

Highly efficient busbars for shorter charging times

Add
Brochure: Depot Charger SLS 301
Brochure: Depot Charger SLS 301

Depot charging with automated connection device

Add
Brochure: Inverted Pantograph SLS202
Brochure: Inverted Pantograph SLS202

SLS 202 – the new dimension of
versatility and working range

Add

Downloads

5 Files online
Any questions?

Do you have any questions about e-bus pantographs?

 Portrait of Timo Staubach, Head of SBA Battery Driven Vehicles at Schunk Transit Systems